F1SYH-TX1 — lot 131
Assemblage A1 REV-C
Suivre dix-sept opérations de la carte nue à la recette.
Point critique : Ne pas installer le fusible définitif avant les premiers contrôles de consommation.
Détails
Operation_ID;Description;Operator;Inspector;Date;Status;Evidence;Notes A1-010;Documentation and PCB revision check;;;;;; A1-020;Bare-board visual inspection;;;;;; A1-030;Measure resistance VIN/GND and each rail/GND;;;;;; A1-040;Assemble resistors and small capacitors;;;;;; A1-050;Assemble INA180, AP2112, diodes and ferrite;;;;;; A1-060;Assemble LM2596 devices and feedback network;;;;;; A1-070;Assemble inductors and electrolytics;;;;;; A1-080;Assemble Q1, fuse holder, terminals and test points;;;;;; A1-090;Clean and inspect polarity/orientation;;;;;; A1-100;Power without fuse and with bench current limit through temporary 100 ohm resistor;;;;;; A1-110;Verify no abnormal current, then install fuse;;;;;; A1-120;Bring up 5V only with U1/U3 disabled or unpopulated;;;;;; A1-130;Bring up 8V rail;;;;;; A1-140;Bring up 3.3V rail;;;;;; A1-150;Validate current and voltage sensing;;;;;; A1-160;Run complete JIG-A1 test plan;;;;;; A1-170;Apply serial label and archive evidence;;;;;;
Ordre
Passifs, petits boîtiers, puissance, connecteurs.
Première alim
Résistance temporaire et courant limité.
Traçabilité
Opérateur, inspecteur, preuve.
Spécifications
| Archive | F1SYH_TX1_A1_REV_C_ASSEMBLY_KIT.zip |
|---|---|
| Traveler | CSV |
| Visual checks | 10 |
| Release | NON |